Solid Strip Flooring Installation 
  
    
                               
    
  
  - 	Solid strip flooring should be installed on grade or above grade, not below grade. 
- 	Solid strip flooring installation should be the last step of your construction job to minimize damage   from excess traffic, etc. 
- 	Prior to the installation, air conditioning and heating systems must be operating at 21o Celsius for a minimum of one  week. 
- Prior to the installation, the relative humidity must be maintained at about 40%, between 35% & 55%    and after the installation as well.
- 	 Wooden subfloor moisture test should not exceed 12% and the difference between your  subfloor & boards should be less than 2 to 4% depending on the width of the board.
- 	Acclimatization of your wood requires the wood to be in the room were the installations will occur generally for a minimum of 72 hrs. But the product must be checked to meet the  manufacturer's moisture guide lines before the installation begins.
- 	Solid strip flooring can be installed perpendicular or on a diagonal over a single layer subfloor. 
- If running your wood parallel to the joists add a layer of 1/2" plywood.
- 	Resecure subfloor to the joists every 6" to 9" to remove squeaks. This is your last chance to access   the joists 
- 	Subfloor surface must be flat. The average maximum tolerance is 3/16" in 10' . If levelling is  required, sand or use levelling compound to fix uneven spots. Some manufacturer's recommend  up to 6 layers of 15 lb builders felt. Excessive sanding may lead to your subfloor being not thick  enough. 
- 	Undercut door and closet casings 
- Vacuum and free debris such as cleats, nail heads, dried glue, paint or any other materials. 
-  A barrier is recommended, 15 lbs asphalt saturated felt paper or wax paper are commonly used.	Installing a vapour retarder reduces the chance for moisture or vapour related problem but it does not guarantee eliminating moisture or vapour related problems. A barrier benefits you  to eliminate squeaks from wood to subfloor contact; boards slide more easily during the installation, and helps reduce dust.  
-  Floor should be installed from a minimum of three  cartons to insure colour and shade mixtures. Rack out most of the room before installing
-  Make sure to stagger at the ends of the board a minimum of 6" to 12" in adjacent rows - no gaps
- 	Fastening schedule,(1 1/2" to 3 1/2" boards every 8" to 10") and (3 1/2" boards and up every 6" to 8") 
- 	An expansion joint of @ 3/8" is required around the perimeter of the room.  
-  Please feel free to contact us with any of questions or concerns you may have 
Note: always follow manufacturer's recommendations
    
                      
   