Beaumaris District, Inflow / Infiltration study on an existing lift station.
Tipaskan Phase II-H, design and construction supervision of 900 metres of storm relief sewer ranging from 900 mm to 1800 mm in size.
Tipaskan Phase II-H, design of a 9,000 m
Horse Hills Creek, storm run-off evaluation for the watershed. Design of a new multi-plate arched culvert.
TOWN OF PONOKA, ALBERTA
Sommer Bros Contracting Ltd., 120 lot residential subdivision.
Private Developer, Area Structure Plan for 60 hectares.
Private Developer, 21 lot residential subdivision
Private Developer, 10 lot "country estate" subdivision.
VILLAGE OF ENTWISTLE, ALBERTA
Alberta Transportation, stormwater management from the Highway Nos. 16 and 22 interchange to the Pembina River using specially designed down spout pipe and energy dissipater.
Water supply and treatment: Water well and iron removal filters.
Sewage lagoon upgrading.
MUNICIPALITY OF CROWSNEST PASS, ALBERTA
Coleman 9,000 m3 Gunite water reservoir, three water wells rated @ 60 LPs, three 200 HP booster pumps, 3,400 metres of 300 mm ductile iron supply main, pressure reducing and booster pumping stations
Bellevue; 4,500 m3 Gunite water reservoir, two 10 HP distribution pumps and a 30 LPs pressure sand filter water treatment plant
VILLAGE OF BITTERN LAKE, ALBERTA
New water infrastructure facilities that included 15.0 kilometres of 150mm polyethylene water supply line from the City of Camrose, a 500m3 treated water reservoir, fire and distribution pumping, and a new water distribution system. The $1,550,000 project was funded by the Village of Bittern Lake, Alberta Utilities and Transportation and the Prairie Farm Rehabilitation Administration (PFRA) under the Rural Water Development Program (RWDP)
Sewage collection mains and facultative sewage lagoon treatment.